Building Traffic

Traffic flow within the building will be directed by signage on the floors.  This measure is being taken to ensure that staff and children remain six feet apart in lines and at other transition times throughout the school day. The school will utilize as much of the building as possible to achieve social distancing and may close high-traffic portions of the building when not used.